A process in which temporary wood or steel structures are used to support the weight of concrete during setting and hardening.

Certified
Versatile
Time-saving
Cost-effective

We provide elements for formwork and shoring using metal props or structural scaffolding with optimized load capacity for building projects. Our systems include a range of accessories to adapt to any job, offering flexibility in height and required areas.
Our M-3, M-4, M-5, M-6 and M-7 frames are made from S235JR, S355JR and S355MC cold-drawn schedule 40 steel tube, providing optimal resistance for shoring, connected to each other by cross braces that ensure stability.
The PR-30 prop is built from a base element of 60mm diameter steel tube, 1.60m long, with perforations for inserting the pin designed to stop the telescoping tube. It features a base with a threaded spindle and nut fixed to the prop base, allowing micrometric adjustment.
Our team of experts is ready to provide you with the best solution.
